West Pearce Boulevard and Meyer Road – Signalization


Project Description:

// LINK TO PROJECT CONCEPTUAL MAP AS ATTACHED //

Construction of intersection improvements along West Pearce Boulevard at Meyer Road and Cheryl Ann Drive including conversion of the Cheryl Ann Drive intersection to a two-way stop controlled intersection and conversion of the Meyer Road intersection to an all-way signal controlled intersection.  Improvements will include improved turning radiuses, sidewalk replacement, curb ramps, crosswalks and ADA compliant push buttons.  The signal will be interconnected to the City’s traffic signal system to monitor operations and provide optimal timing plans.

This project is to be designed with in-house engineering staff.

Project Status:

  • August 2020- Right-of-Way Acquisition and Utility Coordination-
  • Construction 2021



 



bg

Stay Up to Date
Sign up for our eNewsletter